Skip to content
  • Contact us
  • Careers
  • Structural Engineering
    • Conservation engineering
    • Architectural engineering
    • Sustainable engineering
    • Structural inspections
    • SER certification
    • Building information modelling (BIM)
    • Expert witness
  • Civil Engineering
    • Feasibility studies
    • Roads
    • Drainage
  • Sectors
    • Arts & Leisure
    • Community Projects
    • Conservation & Refurbishment
    • Developments
    • Distilleries & Breweries
    • Hotels
    • Industrial & Commercial
    • Residential
    • Schools
  • Projects
  • About Narro
    • Our commitment to clients
    • Our People
    • Our History
    • Sustainability
    • Employee Ownership
    • Graduates
    • CARE
    • Diversity
  • News
  • Working with us
  • Contact
    • Edinburgh office
    • Glasgow office
    • Stirling office
    • Inverness office
    • Aberdeen office
    • Newcastle office
  • Structural Engineering
    • Conservation engineering
    • Architectural engineering
    • Sustainable engineering
    • Structural inspections
    • SER certification
    • Building information modelling (BIM)
    • Expert witness
  • Civil Engineering
    • Feasibility studies
    • Roads
    • Drainage
  • Sectors
    • Arts & Leisure
    • Community Projects
    • Conservation & Refurbishment
    • Developments
    • Distilleries & Breweries
    • Hotels
    • Industrial & Commercial
    • Residential
    • Schools
  • Projects
  • About Narro
    • Our commitment to clients
    • Our People
    • Our History
    • Sustainability
    • Employee Ownership
    • Graduates
    • CARE
    • Diversity
  • News
  • Working with us
  • Contact
    • Edinburgh office
    • Glasgow office
    • Stirling office
    • Inverness office
    • Aberdeen office
    • Newcastle office

Campsie Memorial Hall

Lennoxtown
Client: East Dunbartonshire Council
Architect: ECD Architects
Completed: April 26
Value: £1.4m
Status: Complete
Photographer: McAteer Photography

Home / Campsie Memorial Hall

Project overview

The transformation of a Victorian community hall into a modern civic facility.

Campsie Memorial Hall in Lennoxtown has been transformed from a complex, ageing Victorian community building into a modern, accessible and energy-efficient civic facility. Delivered for East Dunbartonshire Council through hub West Scotland, with ECD Architects as architect and lead consultant, the project refurbished the original 1860s stone halls while replacing a later extension with a new, highly insulated timber addition.

Narro provided structural and civil engineering services, supporting the design team in balancing heritage retention, low-carbon retrofit principles and the practical demands of a fully upgraded community venue. The engineering approach focused on retaining and improving the existing building fabric wherever feasible, while enabling new layouts, services and access improvements that would support the Hall’s long-term use.

The existing Hall presented a series of structural constraints typical of historic community buildings. The original stone halls, dating from 1866, were to be retained, including the stage and principal community spaces, while the building’s poor thermal performance, fragmented internal arrangement and limited accessibility had to be addressed.

A key challenge was the building’s historic layout, which had been arranged across seven different levels. This created significant accessibility barriers and complicated the integration of new circulation, a platform lift, ramped access and upgraded back-of-house facilities. Narro’s work supported the rationalisation of the building to three levels, helping create a more inclusive arrangement while retaining the character and function of the original halls.

Narro reviewed the capacity of the existing foundations, undercroft walls and timber roof structure to understand how they could support the refurbished spaces, the new extension and new building services. Narro’s design input centred on careful appraisal, targeted strengthening and close coordination with the wider design team. During the early design stages, the engineering strategy sought to reuse as much of the existing substructure as possible, including the original foundations and undercroft walls. This required investigation and checking to confirm how the retained structure would respond to new load paths and revised layouts.

The introduction of decarbonised heating and ventilation systems added further engineering complexity. New air source heat pumps, MVHR equipment and associated ductwork had to be integrated into an existing building with timber roof structures and limited space for plant. Narro carried out structural checks and coordination to support the placement of heavy plant, including the eventual positioning of equipment on a new roof area, while accounting for the loads imposed by large ventilation ducts serving the main hall.

The replacement extension also required a structural approach that complemented the retained stone halls. The new timber extension improved the building’s thermal performance and supported the Hall’s renewed civic presence, while the structural design enabled a more coherent, accessible arrangement of spaces across the building.

The completed refurbishment has safeguarded Campsie Memorial Hall as a valued community asset while improving comfort, accessibility and energy performance. The project has delivered refurbished main and lesser halls, improved storage and support spaces, step-free access, a new entrance and a more legible internal arrangement.

For Narro, the project demonstrates the value of engineering-led retrofit: understanding the existing structure, retaining viable fabric, integrating low-carbon services and enabling contemporary accessibility standards within a historic building. The result is a more sustainable and flexible venue that can continue serving Lennoxtown for years to come.

Services

Services provided

Loading...
Architectural engineering
Sectors
Loading...
Conservation & Refurbishment
Community Projects
Dedicated team

Leanne Nimmo

Associate

Meet Leanne Nimmo
Leanne joined Narro in July 2020.
MEng, CEng MIStructE MICE

Garry Porch

Board Director

Meet Garry Porch
Experienced in project management and contract administration, structural surveys, design of building structures in traditional materials, facade design, and cold formed steel construction.
BSc(Hons), CEng, FICE

James Dewar

Senior Technician

Meet James Dewar
James joined the Narro Glasgow team in 2024.
HND Computer Aided Architectural Design & Technology
Projects

Related projects

Black Bull Close

Dunbar
View
Community Projects
Conservation & Refurbishment

Diocesan Centre

Glasgow
View
Community Projects
Conservation & Refurbishment

Kinning Park Complex

Glasgow
View
Arts & Leisure
Community Projects

The Rockfield Centre

Oban
View
Arts & Leisure
Community Projects
View all projects

Sign up to our newsletter

  • Site Terms and Privacy Policy
  • Business Terms and Conditions
  • ISO 14001 Environmental Policy
  • Email Disclaimer
  • BIM Mission Statement
  • Cookie Policy (UK)
  • Site Terms and Privacy Policy
  • Business Terms and Conditions
  • ISO 14001 Environmental Policy
  • Email Disclaimer
  • BIM Mission Statement
  • Cookie Policy (UK)
SSIP Logo - White

Find our offices

We have 7 offices across the UK. We are here to support our clients wherever they need us.

Edinburgh office
Glasgow office
Stirling office
Inverness office
Aberdeen office
Newcastle office
Looking for Structural Engineering companies in London?

Contact us

If you have any enquiries, please feel free to get in touch.

Contact us
Send us an email
Facebook-f Linkedin Instagram

Copyright © 2026 Narro Associates

Website by 39steps

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}