Home / Cabrach Distillery Phase 1
The Cabrach was known in the 1700-1800s (when the original steadings were built) for both illicit and legal whisky production, with some sources marking it as one of the birthplaces of whisky production in Scotland.
From an engineering perspective, the key challenge was to adapt fragile stone agricultural buildings for modern industrial use while preserving their heritage value and responding to a harsh upland environment. Phase 1 delivered the essential infrastructure for operation, including a new access road, restoration works, the distillery itself and a maturation warehouse, establishing the technical foundation for future visitor facilities.
Structural and fabric surveys played a defining role in the scheme. Although the original masonry walls were largely retained, investigations showed that the existing roof structure could not be preserved. The engineering response was a carefully detailed new roof and clerestory arrangement that sits lightly above the original stone walls, creating the additional internal volume required for the copper stills and associated plant. This intervention resolved headroom constraints without overwhelming the historic envelope, and the introduction of glazing improved daylight penetration deep into the production spaces. Masonry repairs, replacement of deteriorated elements and the removal of asbestos roofing all improved durability, safety and long-term building performance.
Material strategy also supported the engineering goals. Natural slate on timber sarking, repaired stonework, exposed timber structure and robust concrete floors created a practical palette suited to distilling operations, moisture loads and heavy use, while maintaining visual continuity with the surrounding landscape. Sustainability measures were integrated into the operational design through latent heat recovery, green energy strategies, locally sourced and reclaimed materials, and extensive native planting. Together, these interventions demonstrate how conservation engineering can do more than stabilise an old structure: at The Cabrach, it enabled a historic building to become productive infrastructure, supporting local employment, future tourism and long-term rural regeneration.