Skip to content
  • Contact us
  • Careers
  • Structural Engineering
    • Conservation engineering
    • Architectural engineering
    • Sustainable engineering
    • Structural inspections
    • SER certification
    • Building information modelling (BIM)
    • Expert witness
  • Civil Engineering
    • Feasibility studies
    • Roads
    • Drainage
  • Sectors
    • Arts & Leisure
    • Community Projects
    • Conservation & Refurbishment
    • Developments
    • Distilleries & Breweries
    • Hotels
    • Industrial & Commercial
    • Residential
    • Schools
  • Projects
  • About Narro
    • Our commitment to clients
    • Our People
    • Sustainability
    • Employee Ownership
    • Graduates
    • CARE
    • Diversity
  • News
  • Working with us
  • Contact
    • Edinburgh office
    • Glasgow office
    • Stirling office
    • Inverness office
    • Aberdeen office
    • Newcastle office
  • Structural Engineering
    • Conservation engineering
    • Architectural engineering
    • Sustainable engineering
    • Structural inspections
    • SER certification
    • Building information modelling (BIM)
    • Expert witness
  • Civil Engineering
    • Feasibility studies
    • Roads
    • Drainage
  • Sectors
    • Arts & Leisure
    • Community Projects
    • Conservation & Refurbishment
    • Developments
    • Distilleries & Breweries
    • Hotels
    • Industrial & Commercial
    • Residential
    • Schools
  • Projects
  • About Narro
    • Our commitment to clients
    • Our People
    • Sustainability
    • Employee Ownership
    • Graduates
    • CARE
    • Diversity
  • News
  • Working with us
  • Contact
    • Edinburgh office
    • Glasgow office
    • Stirling office
    • Inverness office
    • Aberdeen office
    • Newcastle office

Aldourie Estate – Castle

Loch Ness
Awards: 

RIAS 2025 – Winner

Client: Wildland Ltd
Architect: Ptolemy Dean Architects
Contractor: Kishorn Heritage Limited
Completed: 2024
Value: £20m
Status: Complete
Photographer: Simon Kennedy

Home / Aldourie Estate – Castle

Project overview

This project involved a new kitchen extension to the grade A-listed Aldourie Castle on the shores of Loch Ness.

Poor ground conditions on site required a piled foundation solution. Due to the proximity of the castle, vibrations were strictly monitored throughout the process.

A new suspended footbridge was designed to span the adjacent burn to provide access to the rest of the estate to the private guests staying at the castle.

Large reinforced concrete retaining walls were created to create the bastion area and create more space in the courtyard through a stone-faced serpentine wall.

Hidden below ground are extensive civil engineering works involving a pumped SUDS drainage system to serve the whole estate.

Traditional methods of construction and exceptionally high attention to every detail was adopted throughout the Aldourie Estate Castle project.

Aldourie Castle
Aldourie Castle
Aldourie Castle
Aldourie Castle
Aldourie Castle
Aldourie Castle
Services

Services provided

Loading...
Drainage
Architectural engineering
Conservation engineering
Sectors
Loading...
Conservation & Refurbishment
Dedicated team

Mark Hepburn

Board Director

Meet Mark Hepburn
Mark is a Chartered Structural Engineer and Board Director based at Narro’s Inverness office.
BEng (Hons), CEng, MIStructE

Ross Livingstone

Associate

Meet Ross Livingstone
Ross is an Associates with professional experience working on the design and construction of civil and structural engineering projects.
MEng

Derek Thomson

Associate Director

Meet Derek Thomson
Derek joined Narro’s Forres (now Inverness) office in 2016.
HNC Civil Engineering, TIStructE

Neil Benzies

Associate

Meet Neil Benzies
Neil joined Narro in 2015, he is an Associate with over fifteen years’ experience on a wide variety of projects.
BEng (Hons), IEng, MICE, TIStructE, EngTech

Kevin McLellan

BIM/CAD Manager

Meet Kevin McLellan
Kevin manages a team of 13 technicians and ensures that Narro continues to produce technical documents to expected high standard.
HND Structural & Transportation Engineering
Projects

Related projects

Rosslyn Castle

Roslin
View
Conservation & Refurbishment

An Laimhrig

Isle of Eigg
View

Provand's Lordship

Glasgow
View
Arts & Leisure
Conservation & Refurbishment

Fairburn Tower

Muir of Ord
View
Conservation & Refurbishment
View all projects

Sign up to our newsletter

  • Site Terms and Privacy Policy
  • Business Terms and Conditions
  • ISO 14001 Environmental Policy
  • Email Disclaimer
  • BIM Mission Statement
  • Cookie Policy (UK)
  • Site Terms and Privacy Policy
  • Business Terms and Conditions
  • ISO 14001 Environmental Policy
  • Email Disclaimer
  • BIM Mission Statement
  • Cookie Policy (UK)
SSIP Logo - White

Find our offices

We have 7 offices across the UK. We are here to support our clients wherever they need us.

Edinburgh office
Glasgow office
Stirling office
Inverness office
Aberdeen office
Newcastle office
Looking for Structural Engineering companies in London?

Contact us

If you have any enquiries, please feel free to get in touch.

Contact us
Send us an email
Facebook-f Linkedin Instagram

Copyright © 2026 Narro Associates

Website by 39steps

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}